A local dry lining firm moved in the week after to join all the plasterboard and fill around the oak roof frames in all the places where wings are required ;D...
So although we probably still have two thirds of the plasterboarding, insultation & jointing to do we won't now need to do so at 8m-11m high with nothing but fresh air below us...a daunting prospect which would have taken us weeks....Parasote and his team were in and out in a week...
The question of painting these high up awkward areas will be considered at a later date..firmly in the worry about the spelling later file at present.

Next...Having ordered a house worth of windows & doors Alex set to work making holes in the exterior walls (50cm thick rubble) and by Halloween we have 8 more views, one in progress and the final two will be made to order and installed by local firm late in Spring 2011.
View east from living area 'to be'
Velux & two south facing windows in the girls bedroom 'to be'....jpg)